top of page

information
04/ 28/ 2025
installation of two new stationary Cummins 1.5 MW stand by Power generator on a new concrete slabs.
Generators to connect 4 new Trystar Generator docking stations with Breaker and key interlock to provide with back up power for 505,000 sq/ft Fedex ground Facility.
Project Gallery
bottom of page